Riverwood Solutions
  • Home
  • Solutions
    • Product Realization
    • Manufacturing & Supply Chain Optimization
    • Operations Management
  • Customers
  • Team
  • Careers
  • Contact
  • News

Launch your campaign with confidence

Our industry experts provide an assessment of your product and feedback on mission critical requirements

Riverwood Solutions and Indiegogo have come together to bring your product idea to market at lowest cost, highest quality and fastest time


RWS Verified


For campaigners preparing to launch an Indiegogo campaign, RWS Verified provides a level of confidence that schedule and product are viable​
LEARN MORE
Picture

FAQs

What documents will I need to provide to Riverwood Solutions to being the Verified evaluation process?
We will be looking to review what we consider a minimal set of documents that includes the Marketing Requirements Document (MRD), 2D and 3D mechanical drawings, electrical drawings (schematics, gerbers, etc.). Bill of Materials (BOM), and Color, Material, Finish (CMF) requirements.
​Why do I need to have a Market Requirements Document (MRD)?
​The MRD is a critical document that several follow-on activities depend upon.  We will use the document as the basis for evaluating the overall viability of the product.  If you don’t have an MRD, we ask a few questions to obtain what we consider the minimum information required to proceed with the evaluation and which should serve as the basis for a full MRD.
​What if I don't have an MRD?
We will ask you a series of questions that will serve as as an MRD-lite for the purposes of this evaluation.    As part of the Optimized offering, we will help you build out your MRD and the associated Product Requirements Document (PRD).  Some of the information that is needed is a general product description, target retail pricing, product performance requirements, and targeted market availability (date and quantity).
​What if I don’t have all of the requested documentation?
The documents that we request after the MRD (or MRD-lite) are the 2D and 3D mechanical drawings, electrical drawings, Bill of Materials (BOM), and and special Color, Material, Finish (CMF) requirements.  If these are not available, then it's likely that the project is not yet ready for evaluation.
​What of my documents are not complete?
Our team will evaluate the provided document package once all the information has been uploaded into our site. At that we will make a determination as to whether or not there is sufficient information to provide a meaningful product analysis.   If not, we will follow up and provide feedback about areas that need clarification.
How long does the evaluation process take before I get a report?
Typically, a report will be delivered by the end of the second full business week after the document package is deemed complete.
​What is the cost and how do I pay?
The cost for a Verified analysis is $7,500 that can be paid via credit card or PayPal.

solutions

Product Realization
Manufacturing & Supply Chain Optimization
Operations Management

Company

Team
News
Contact us
© COPYRIGHT 2016. ALL RIGHTS RESERVED.
  • Home
  • Solutions
    • Product Realization
    • Manufacturing & Supply Chain Optimization
    • Operations Management
  • Customers
  • Team
  • Careers
  • Contact
  • News
✕